Template-to-install precision
Laser templating and same-team installs keep panes perfect on fast schedules.
Frameless Shower Specialists
Precision installs, curated hardware, and concierge coordination for homeowners, contractors, and property managers across the GTA.
2,785+
frameless installs documented
97%
on-time delivery routes
312+
turnover packets issued
“They templated on Monday and installed by Friday. The suites feel boutique—our residents noticed immediately.”
A quick read on how we keep contractors, designers, and facilities teams ahead of schedule.
Laser templating and same-team installs keep panes perfect on fast schedules.
Monroe, CRL, FHC, and matte black lines stocked locally for rush swaps.
Edge guards, film wrap, and water checks documented for your closeout.
Quote packets outline glass specs, hardware codes, and milestone pricing.
Each route carries templating gear, pre-labeled hardware, and a documentation trail so property teams know exactly when and how we arrive.
Toronto Core
Coverage focus
Documentation trail: Concierge check-ins, elevator bookings, and signed delivery slips archived in turnover packets.
West GTA
Coverage focus
Documentation trail: Templating photos, low-iron glass confirmations, and hardware manifests synced to builder portals.
North Corridor
Coverage focus
Documentation trail: CSA tempering stamps, warranty cards, and maintenance guides bundled for property managers.
East & Halton Routes
Coverage focus
Documentation trail: Route logs with timestamped before/after photos and service ticket sign-offs.
Frameless swing door assemblies
Custom-cut tempered panes with premium hinges, sweeps, and seals staged for single-day installs.
Quote packets include hinge schedules, panel specs, and final inspection checklist templates.
Steam enclosure systems
Full-height doors, transoms, and returns engineered for controlled vapor with mitred corners.
Submittal bundles deliver gasket diagrams, slope confirmations, and CSA glass certificates.
Hardware refresh & service
Rapid-response hinge, handle, and sweep replacements backed by stocked GTA inventory.
Service visit logs capture replaced SKUs, torque specs, and maintenance guidance.
Our crews submit photos, manifests, and sign-offs at each milestone so facilities managers can reconcile progress without chasing updates.
Templating to install window
5-DAY
Laser files released to fabrication the same day so hardware staging matches your tile cure.
On-time dock arrivals
97%
Arrival photos, dock sign-ins, and unload timestamps logged for every scheduled delivery.
Documentation packets delivered
312+
Turnover PDFs include stamped glass certificates, care guides, and punchlist close-out notes.
Quote turnaround commitment
36 HR
Annotated takeoffs and alternates supplied within 36 hours of site intake.
Follow the paperwork from kickoff to turnover—each stage ties back to the metrics above so you can audit progress in real time.
Clean sightlines, precise alignment, and detailing designed to age beautifully.
Mitred glass corners and recessed hinges keep the steam envelope uninterrupted for this 44th-floor suite.
Tight sightlines on 12mm low-iron glass paired with brushed nickel pivots complement terrazzo slabs.
Swap between demo day and turnover—the frameless conversion added 18" of usable shower width.
Property managers we support
Trusted partners
Quote & scheduling
Share site conditions, timing, and reference photos. Our coordinators send pricing packets and schedule templating within two business days.
Accreditation & coverage
Toronto Construction Association
Active member
Workplace Safety & Insurance Board
Clearance certified
CSA A500 Safety Glass
Compliance documentation
Commercial Insurance
$5M liability coverage