Skip to main content

Frameless Shower Specialists

Toronto’s Frameless Glass Shower Experts

Precision installs, curated hardware, and concierge coordination for homeowners, contractors, and property managers across the GTA.

2,785+

frameless installs documented

97%

on-time delivery routes

312+

turnover packets issued

“They templated on Monday and installed by Friday. The suites feel boutique—our residents noticed immediately.”
PROPERTY MANAGER · DOWNTOWN TORONTO
Detail of a frameless glass shower installation in Toronto
INSTALL DETAIL · YORKVILLE

Why Work With Us

A quick read on how we keep contractors, designers, and facilities teams ahead of schedule.

Template-to-install precision

Laser templating and same-team installs keep panes perfect on fast schedules.

Curated hardware library

Monroe, CRL, FHC, and matte black lines stocked locally for rush swaps.

Jobsite ready protection

Edge guards, film wrap, and water checks documented for your closeout.

Transparent numbers

Quote packets outline glass specs, hardware codes, and milestone pricing.

Detailed GTA Service Coverage

Each route carries templating gear, pre-labeled hardware, and a documentation trail so property teams know exactly when and how we arrive.

Toronto Core

High-rise retrofits & boutique hotels

Same-week templating & install crews

Coverage focus

  • Downtown Toronto
  • Liberty Village
  • Harbourfront

Documentation trail: Concierge check-ins, elevator bookings, and signed delivery slips archived in turnover packets.

West GTA

Custom homes & rapid refresh programs

48-hour quote releases, installs inside 5 days

Coverage focus

  • Etobicoke
  • Mississauga
  • Oakville

Documentation trail: Templating photos, low-iron glass confirmations, and hardware manifests synced to builder portals.

North Corridor

Luxury builds & managed communities

Dedicated crews on standing schedules

Coverage focus

  • North York
  • Richmond Hill
  • Vaughan
  • Markham

Documentation trail: CSA tempering stamps, warranty cards, and maintenance guides bundled for property managers.

East & Halton Routes

Service calls & multi-unit turnovers

Route-based service windows twice weekly

Coverage focus

  • Scarborough
  • Pickering
  • Halton Hills

Documentation trail: Route logs with timestamped before/after photos and service ticket sign-offs.

GTA COVERAGE MAP 97% ON-TIME ROUTES
DAILY ROUTES 2,785 INSTALLS LOGGED
Documentation synced to client portals after each visit

Offer catalog snapshots

  • Frameless swing door assemblies

    Custom-cut tempered panes with premium hinges, sweeps, and seals staged for single-day installs.

    Quote packets include hinge schedules, panel specs, and final inspection checklist templates.

  • Steam enclosure systems

    Full-height doors, transoms, and returns engineered for controlled vapor with mitred corners.

    Submittal bundles deliver gasket diagrams, slope confirmations, and CSA glass certificates.

  • Hardware refresh & service

    Rapid-response hinge, handle, and sweep replacements backed by stocked GTA inventory.

    Service visit logs capture replaced SKUs, torque specs, and maintenance guidance.

Delivery metrics you can audit

Our crews submit photos, manifests, and sign-offs at each milestone so facilities managers can reconcile progress without chasing updates.

Benchmarks pulled into JSON-LD

Templating to install window

5-DAY

Laser files released to fabrication the same day so hardware staging matches your tile cure.

On-time dock arrivals

97%

Arrival photos, dock sign-ins, and unload timestamps logged for every scheduled delivery.

Documentation packets delivered

312+

Turnover PDFs include stamped glass certificates, care guides, and punchlist close-out notes.

Quote turnaround commitment

36 HR

Annotated takeoffs and alternates supplied within 36 hours of site intake.

Project timeline & documentation touchpoints

Follow the paperwork from kickoff to turnover—each stage ties back to the metrics above so you can audit progress in real time.

Swipe to review each milestone
  1. 01 Day 0-1

    Discovery & documented quote

    Photo intake, plan markups, and hardware selections aligned with your finish schedule.

    Scope summary PDF with hinge schedules, glass specs, and approval checklists for stakeholders.

  2. 02 Day 2

    Laser templating & site sign-off

    Field techs capture precise measurements and verify substrate readiness before fabrication.

    Templating files, substrate photos, and signed readiness forms uploaded same-day.

  3. 03 Day 3-5

    Fabrication & staging

    Glass panels cut, polished, and paired with pre-labeled hardware for route loading.

    Quality assurance checklist, edge treatment confirmations, and delivery manifest drafts.

  4. 04 Day 6

    Installation & turnover

    Install crews complete fit-out, perform water tests, and walk final punch with site leads.

    CSA glass stamps, care and cleaning guides, and signed completion forms issued to your team.

Property managers we support

Quick testimonials from active portfolios

Swipe to skim

“Glass Showers handled 18 suites for us—templated Wednesday, all doors hung by Monday. Their crews document every pane for turnover packages.”

JULIA M.
Senior Property Manager, Downtown Toronto

“They coordinate with our site supers, confirm elevator bookings, and send CSA paperwork ahead of inspections. Zero schedule surprises.”

RAJ P.
Construction Manager, Vaughan

“Hardware sourcing is painless—they keep CRL and matte black hinges in stock so emergency replacements are next-day.”

ELENA G.
Condominium Operations Lead, Etobicoke

Trusted partners

Hardware & fabrication alliances

Vetted vendor badges
CRL Canada Preferred hardware partner
Monroe Shower Door Expedited custom fabricator
FHC Stocked matte black program
GTA Builders Network Verified vendor

What to Know Before You Buy

Volume-informed planning

2D takeoffs, templating priorities, and install playbooks draw from years of GTA retrofit data.

2,785 frameless installs tracked across our network.

Dock windows that stick

Dispatch cadence and staging protocols are tuned to condo and hotel loading restrictions.

97% on-time arrivals with signed dock and elevator logs.

Turnover-ready documentation

Clients receive inspection packets that cover hardware specs, maintenance, and warranty notes.

312+ turnover packets issued with stamped CSA certificates.

Quotes inside 36 hours

Annotated drawings and alternates support quick approvals without sacrificing detail.

36-hour quote commitment for active project intakes.

Quote & scheduling

Request a Free Quote

Temporarily unavailable Quote submissions are currently disabled.

Share site conditions, timing, and reference photos. Our coordinators send pricing packets and schedule templating within two business days.

  • 48-hour proposals with glass and hardware schedules.
  • CSA stamped safety glass documentation ready for inspectors.
  • Upload field photos so our templaters arrive pre-briefed.

Accreditation & coverage

TCA

Toronto Construction Association

Active member

WSIB

Workplace Safety & Insurance Board

Clearance certified

CSA

CSA A500 Safety Glass

Compliance documentation

COI

Commercial Insurance

$5M liability coverage

Prefer to talk now? Please check back soon.
Heads up Quote submissions are paused while Turnstile isn’t configured. Please check back soon.

Used only to schedule site visits efficiently.

Preferred Contact *
Upload Photos / Files

JPG/PNG/HEIC/HEIF (auto-converted), up to 8 files, 10MB each.

Drag & drop files here or ·
No files added

Measurements, timeline, special requests…

By submitting, you agree to be contacted about your quote. We never sell your information.